Industry

Manufacturing software development

Shop-floor systems that tolerate the shop floor.

MES, quality and maintenance systems that work on a tablet in a glove, on a network that drops, next to machinery older than the software.

The problem

What makes manufacturing builds hard

Legacy systems that cannot be switched off

The system holding the business together is usually the one nobody wants to touch. Replacement has to happen alongside it, not instead of it.

Data that lives in four places

Reconciling records across systems that disagree is most of the work, and it is almost never in the original estimate.

Procurement and audit timelines

The technical work is rarely the long pole. We plan around sign-off cycles rather than being surprised by them.

The answer

How we approach it

Strangle, do not rewrite

New capability goes in front of the old system and takes over route by route, so there is never a single cutover weekend.

Compliance designed in

Audit logging, retention and access control are architecture decisions made at the start, not features bolted on before an assessment.

Evidence at every step

Each increment ships with the measurements your stakeholders need to approve the next one.

Questions

Common questions in this sector

Yes, and it is often the better arrangement. We can lead delivery, embed alongside your engineers, or take a specific workstream. What we will not do is run a parallel process that your team finds out about at handover.

Yes, including public-sector frameworks and security questionnaires. We plan around sign-off cycles rather than being surprised by them.

Yes. We build to WCAG 2.2 AA as a default constraint. Retrofitting accessibility after launch costs several times more than designing within it.

You do, from the first commit. Work lands in your repository and your cloud accounts. There is no proprietary framework that only we can maintain, and no exit fee.

Most of our revenue comes from clients past their first release. Support, patching and the next roadmap are a normal continuation, with response times agreed in writing rather than assumed.

Next step

Building something for manufacturing?

A 30-minute call with an engineer who will scope the work — not a salesperson reading from a deck.